Chartreuse Blog


Progress Continues at Summit House

Bruns Construction continues building the structure for the straw bale shed at Summit House…

Box columns are up!

The box columns are constructed of a double 2 x 4 on the exterior and a single 2 x 4 on the interior of the column.  15/32 plywood is used to sheath the boxes on both sides.  Plywood is used, as opposed to OSB, because it will stand up to moisture better if any water were to get inside the bale wall.

The columns are as deep as the bales and sit on the base layer of sills and between the second layer of sills.  They are bolted to the sills and the foundation (two per column) with 7″ x 1/2″ anchor bolts.

The first column to go up will frame the double door.

Advertisements

Leave a Comment so far
Leave a comment



Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s



%d bloggers like this: